Prepared plans, specifications and took bids for a Reverse Osmosis system for municipal water as well as water line improvements in the district.
Prepared plans, specifications and took bids for a pump station and numerous improvements in the district.
Stake the Maximum Elevation contour for Lake OH Ivie Reservoir owned by the Colorado River Municipal Water District. Furnished field crews, onsite project engineer, Registered Professional Surveyor to prepare legal documents on purchase tracts to be in the reservoir.
Ground Water Recovery and Injections System design and construction project with International Technology Corporation. Locate Recovery Wells, Injection Wells, Easements, and Treatment Facilities.
Design Alternate Water Supply system for providing City of Odessa water to those residents who wished to obtain such service.
Prepared all boundary survey, topographic survey, subdivision plat for recordation, prepared the site civil and drainage, and detention, oversaw the site work and drainage.
Field surveyed the entire route with topo and location of all visible pipelines, power lines, fences, etc. Prepared legal descriptions, exhibits and field staked, for all land owners, the Right of Way. Staked centerline for Right of Way clearing, staked each structure for construction.
Prepared all boundary survey, topographic survey, subdivision plat for recordation, prepared the site civil and drainage, and detention, oversaw the site work and drainage.
Brownstone 1st – 9th Addition
Emerald Forest Estates
The Fountains 1st – 3rd Addition
Frac Tech 1st – 2nd Subdivision
The Links Addition
Lonesome Dove 1st – 6th Subdivision
MCM Plaza 1st – 2nd Filing
Medical Center Northeast 1st - 2nd Addition
Mission Estates, 7th and 11th Filing
Mission Greens Estates
Mission Pines Addition
North Country Club Estates 4th
Plantation Oaks 1st – 7th Addition
Renaissance Estates
The Estates of Shiloh